-
Trumann Elementary
School
Fowler Engineering provided structural engineering services for the 87,000 sq. ft.
elementary school in Eastern Arkansas. A hybrid design of pre-engineered steel,
structural steel and reinforced masonry was utilized for the super structure along with
shallow concrete foundations. To ensure the safety of the students, one classroom on each
wing was designed as a custom safe room.
-
NWCC Football Fieldhouse
This 24,000 sq. ft. fieldhouse was engineered structurally by Fowler Engineering
to be the hub for the NWCC Rangers athletics department. The design consisted of
reinforced concrete and light gage steel truss roof system founded on shallow concrete
foundations. The building, which sits adjacent to the football field, will house
coaches’ offices, athletic trainer rooms, meeting rooms, an area for hydro therapy,
and a weight room.
-
NWCC Allied Health
Fowler Engineering provided structural engineering services for the two-story,
30,000 sq. ft. Allied Health building. The design consisted of a steel super structure,
a light gage metal truss roof system, along with shallow concrete foundations. This building features a
student lounge, kitchen, multiple offices, a shared computer lab, a custom safe room, and labs
and classrooms that will be utilized by students from various medical majors.
"The rain came down, the streams rose,
and the winds blew and beat against that house; yet it did not fall,
because it had its foundation on the rock." Matthew 7:25
FEATURED PROJECTS
St. Francis Xavier Catholic Church
Southern Pine Electric Power Association: Phase 6
Blackshear Place Baptist Church
Connect With Us
Contact Us Today: 662-469-9571
1989 Oak Tree Cove, Suite A, Hernando, MS 38632